|
Post by Ron Pittman on Jul 30, 2007 6:44:43 GMT -5
Hole #13 has an elevated target. 1. Need to know how much dirt to drop - about 4 feet high. Sorta flat on the very top, so you can stand and get your put.
- Maybe 8 feet wide at the bottom?
- Made a cute drawing, but I have no idea how to paste it here.
2. Need someone to drop some dirt. 3. I'm good for the sod on top. Ideas? Ron
|
|
|
Post by Ron Pittman on Aug 5, 2007 18:01:18 GMT -5
bump
OK , so no dirt. But, no ideas?? Come on!
Ron
|
|
|
Post by jhenley on Aug 6, 2007 8:21:51 GMT -5
Check with a subdivision near by that is being developed. The guys hauling off the dirt get paid by the load. If you offer them a closer place to dump a load or two, they will usually give you the dirt. That's one more load they can haul and get paid for. You shouldn't need more than 2 loads to get the elevation you want.
|
|